1. Container Pre-treatment: Rust removal, grinding, and anti-corrosion painting;
2. Structural Modification: Cutting, welding, and reinforcement (adjusted according to the apartment layout);
3. Internal Installation: Laying insulation layer, pre-burying water and electricity pipelines, installing doors and windows, and laying flooring;
4. Exterior Treatment: Touch-up painting and labeling (customer-specified logo or number).
1. Structural Inspection: Checking welding strength and structural stability;
2. Functional Inspection: Testing door and window sealing and water and electricity pipeline unobstructed flow;
3. Appearance Inspection: Checking paint surface smoothness and absence of damage or deformation.